Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20160012
Release date: 30 September 2016

Promoter – Financial Intermediary

MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRE

Location

Description

Construction of a 2x2 lane viaduct of about 2070 m and its connections to the urban network of the city of Bizerte

Objectives

The project rationale is to reduce traffic congestion in the city centre of Bizerte, Tunisia's third-largest city.

Comments

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 123 million

Total cost (Approximate amount)

EUR 247 million

Environmental aspects

If the project was located within the EU, it would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and would require full EIA and public consultation. Two full EIA procedures with public consultations for the different components of the project have been done according to Tunisian national legislation. The Bank shall investigate environmental and social (E&S) aspects and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices.

Procurement

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Status

Signed - 3/01/2017

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Tunisia Transport