Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
500 000 000 €
Pays
Secteur(s)
France : 500 000 000 €
Transports : 500 000 000 €
Date(s) de signature
13/11/2023 : 150 000 000 €
20/03/2024 : 350 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
12 septembre 2023
Statut
Référence
Signé | 13/11/2023
20180045
Nom du projet
Promoteur – Intermédiaire financier
PLAN RAIL NOUVELLE AQUITAINE
REGION NOUVELLE-AQUITAINE
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 500 million
EUR 1970 million
Lieu
Secteur(s)
Description
Objectifs

The project is expected to consist of multiple schemes, including acquisition of electric rail rolling stock, retrofit of diesel trains, modernisation of rail lines, including the construction of the new suburban express commuter rail network, RER Métropolitain de Bordeaux (linking Bordeaux and its suburbs in the Bordeaux metropolitan area and acquisition of associated rolling stock) and new construction of rail depots in the Nouvelle Aquitaine Region in France

The aim of the project is to accelerate the decarbonization of the regional mobility including the regional railways operations on non-electrified lines in the Region. The project will cover infrastructure investments (mainly the rehabilitation and upgrade of existing railway infrastructure), as well as acquisition and modernisation of rolling stock aimed at improving the quality and increase the offer of commuter, regional and long distance passenger rail services within and in relation with the Nouvelle-Aquitaine Region in France.

Additionality and Impact

Conscious that the modal shift towards public transport is a key factor to decarbonizing the mobility, The Region Nouvelle Aquitaine is deploying the full range of its resources to support investments that will accelerate it around the Bordeaux capital region but also in all less developed and more rural areas of the region. The poor state of the rail network has undermined the development of public transport solutions over the last decade. The Region has decided launched a rail plan designed to upgrade and regenerate the entire regional rail network. 


This operation, structured as a Framework Loan, is expected to include infrastructure investments as well as acquisition and modernisation of rolling stock aimed at improving the quality and increasing the offer of commuter, regional and long distance passenger rail services within and connecting the Nouvelle-Aquitaine Region in France with other regions. The project will also support cleaner railway operations with the deployment of alternative propulsion railway systems.


The project yields good benefit streams from reduced journey times, ensuring several railway lines in poor condition will not be closed or will be reopened, efficient operation, reduced vehicle operation costs and energy consumption, improved comfort and safety and reduced environmental cost of the transport system. By improving the quality and the level of services, the project will help railways compete with other modes maintain and/or improve its modal share. The project is located in an EIB Cohesion region.


The Project is fully aligned with EIB public policy goals (sustainability and green transformation; innovation) and will contribute to a wide range of EU policy objectives, in particular those strengthening the EU's economic, social and territorial cohesion and the decarbonisation and modernisation of the European transport and mobility system. The schemes to be financed will contribute to EU, France and the Region's climate and environmental priorities and cross-cutting objectives and policies.


The long-term financing granted by the Bank will help to make the investment more cost-efficient for the borrower and will allow it to diversify its sources of financing. The possibility of obtaining a fixed rate over a long maturity, the repayment deferral and the flexibility offered during drawings are elements which will make it possible to adapt/spread the debt service burden.

Aspects environnementaux
Passation des marchés

In relation to the infrastructure works and construction of depots, the compliance with the requirements of the EIA directive and the development consents are to be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. The components related to acquisition of rolling stock do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU. In addition, the arrangements for the scrapping of the replaced stock and for any decommissioning of maintenance depots will be checked during appraisal. The project is expected to have a positive environmental impact by helping railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.

The Bank will require the Promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU or Directive 2004/17/EC as applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Milestone
À l'examen
Approuvé
Signé
24 octobre 2023
13 novembre 2023
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - PLAN RAIL NOUVELLE AQUITAINE
Date de publication
28 Oct 2023
Langue
Sujet général
Prêts
Numéro du document
172217513
Thématique du document
Information Environnementale
Numéro du projet
20180045
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens
Fiche récapitulative

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes