Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

BRUSSELS REGION SUSTAINABLE MOBILITY

Signature(s)

Montant
475 000 000 €
Pays
Secteur(s)
Belgique : 475 000 000 €
Transports : 475 000 000 €
Date(s) de signature
15/12/2022 : 475 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
10 octobre 2022
Statut
Référence
Signé | 15/12/2022
20180612
Nom du projet
Promoteur – Intermédiaire financier
BRUSSELS REGION SUSTAINABLE MOBILITY
REGION DE BRUXELLES CAPITALE,SOCIETE DES TRANSPORTS INTERCOMMUNAUX DE BRUXELLES
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 475 million
EUR 1089 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the acquisition of 94 electric buses, 90 trams and 43 metros and of new equipment. It will also cover specific changes to the existing infrastructure, as well as the renewal of 63 km of single tracks of the tram and metro networks.

The loan will support the implementation of the Sustainable Mobility Plan for Bruxelles Region to improve the local public transport quality, reliability, safety and accessibility. By encouraging the use of public transport and intermodality, the project will not only improve energy efficiency but also contribute to mitigate the effects of climate change, as per the EIB climate roadmap. The operation, which is a "project of common interest" (article 309 of the EU Treaty point c) is also in line with the EIB's Lending Policy in the Transport Sector and with the objectives of the Paris Agreement, the European Green Deal and the EU Urban Mobility Framework (COM(2021) 811).

Additionality and Impact

L'opération proposée est conforme à la Politique de Prêt de la Banque dans le Secteur des Transports et contribue à plusieurs objectifs de développement durable ainsi qu'aux objectifs du Pact Vert pour l'Europe et de la Stratégie de Mobilité Intelligente et Durable de l'UE.


L'opération est conforme aux dispositions de l'Annexe 2 de la Climate Bank Roadmap 2021-2025 de la Banque en termes d'alignement aux objectifs de l'Accord de Paris.


Le Projet permettra d'améliorer la qualité et l'attractivité de l'offre de services de transport en commun afin d'atteindre les objectifs de report modal fixés dans les documents stratégiques. Une réduction des défaillances du marché est donc attendue, en particulier des externalités négatives (« Externalités ») liées à l'usage des véhicules privés telles que les accidents routiers et les nuisances environnementales (pollution atmosphérique et sonore, réchauffement climatique) Les investissements permettront de diminuer la saturation des lignes les plus chargées du réseau surtout en heure de pointe et la congestion routière grâce au report modal (« Biens Public ») et ainsi améliorer la desserte du territoire et l'accessibilité aux lieux de travail, d'études, et aux équipements urbains (« Compétition Imparfaite »).


Financially, the operation will ensure that RBC has access to sufficient and stable financial resources for the timely implementation of the project. The Bank provides flexibility in terms of availability and grace periods, allowing RBC to spread out its investments over the planned construction period. The Bank´s provision of a 25-year-financing increases the stability of the management of the Borrower´s long-term obligations.

Aspects environnementaux
Passation des marchés

The promoter's environmental management capacity to properly apply the relevant EU Directives will be verified during appraisal, particularly with regard to the EU Environmental Impact Assessment (EIA) EIA Directive 2011/92/EU amended by 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The manufacturing of rolling stock and of the signalling equipment will take place in the manufacturers' plants and therefore does not fall within the scope of the Directive 2011/92/EU amended by Directive 2014/52/EU. Therefore, no EIA will be required for this type of components. Given the nature of the components, no major environmental impacts are foreseen at implementation stage. The project should have an overall positive impact on the environment by promoting sustainable urban development and reducing energy consumption. Arrangements for the scrapping of the replaced rolling stock will be further assessed during appraisal.

The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with EU procurement legislation, 2014/25/EU or 2014/24/EU where applicable as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
24 novembre 2022
15 décembre 2022
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - BRUSSELS REGION SUSTAINABLE MOBILITY
Date de publication
5 Dec 2022
Langue
Sujet général
Prêts
Numéro du document
156785311
Thématique du document
Information Environnementale
Numéro du projet
20180612
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes