Signature(s)
Fiche récapitulative
- Transports - Transportation and storage
The project consists of the acquisition of 80 new trainsets: 40 of them will be narrow-gauge and all of them will be used in Madrid Metro Line 1. The other 40 new trains to be purchased will be wide-gauge trainsets, 33 to replace existing units of different ages, and another 7 new trainsets to cope with the future increase of capacity of the Madrid Metro network due to the latest extensions of the metro lines.
The aim is to increase the overall quality of the public transport service and allow - in the longer term - an increase in the capacity of the metro network to cope with an expected demand growth. It will also reduce the operating costs of the metro system, mainly the maintenance costs of the rolling stock and increase the quality of the public transport services in terms of availability and reliability.
The Project aims at increasing the overall quality of the public transport service through the renewal of end-of-life metro trainsets. The Project is expected to reduce maintenance costs for the metro rolling stock while increasing the availability and reliability of public transport services. The Project is also expected to generate positive externalities for the city's residents in terms of supporting accessibility to services and employment by providing a more efficient and affordable alternative for urban mobility needs.
EIB's participation will provide a financial benefit to Metro de Madrid as it allows distributing the cost of financing in the long term with up to 30 years tenor loan, resulting in a manageable annual debt service amount. The EIB will include flexible drawdown terms and conditions adjusted to the investment horizon of the Project, which are highly valued by public promoters and a key differentiating feature of EIB's financing. The EIB loan could have a signalling effect, facilitating additional financing from complementary sources, which will reduce the funding uncertainly for Metro de Madrid.
The manufacturing of the new trains will take place in the factories of the manufacturer and it falls outside the scope of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the EIA Directive2014/52/EU. Therefore, no EIA will be required for the metro rolling stock. Due to the nature of this project, no impact on any Natura 2000 areas is anticipated. The project is expected to have a positive environmental impact by helping the public transport to increase and/or maintain modal share. Furthermore, the project should contribute to reducing the GHG emissions and noise. The promoter needs to confirm that the old rolling stock will be disposed of or decommissioned in line with applicable EU legislation and best practice. The requirements of social standards will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, and pollution prevention and control.
The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directives 2014/24/EU and 2014/25/EU, where applicable, as well as Directives 92/13/EEC or 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication notices in the EU official Journal, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
À la une
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes