Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

EV CHARGING ITALY (FM)

Signature(s)

Montant
25 000 000 €
Pays
Secteur(s)
Italie : 25 000 000 €
Transports : 25 000 000 €
Date(s) de signature
16/12/2019 : 25 000 000 €
Lien vers la source
Fiche technique

Fiche récapitulative

Date de publication
29 mai 2019
Statut
Référence
Signé | 16/12/2019
20190230
Nom du projet
Promoteur – Intermédiaire financier
EV CHARGING ITALY (FM)
BE CHARGE SRL
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 25 million
EUR 75 million
Lieu
Secteur(s)
Description
Objectifs

The project consists of the financing of the expansion of the electric vehicles charging ("EVC") infrastructure accross Italy by BeCharge. The company expects to install 3 700 EVC by 2024.

The project will contribute to push the transition towards lower carbon transport vehicles. The project is in line with EU Directive on Alternative Fuels 2014/94/EU, which has set out minimum requirements for the building up of electric vehicles charging infrastructure. Finally, part of the investment is expected to take place in cohesion regions. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest.

Aspects environnementaux
Passation des marchés

The project components consist of short connections to the distribution grid networks and the respective charging stations. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction. After completion, no environmental impact is expected from the ordinary operation of the stations. No environmental impact assessment is required for the project, as it does not fall under either Annex I or Annex II of the EU Environmental Impact Assessment (EIA) Directive. The electric vehicles (EV) infrastructure in itself is not subject to environmental impact assessment processes under either Annex I or Annex II of the EIA Directive. However, the building of green field parking locations where the EV infrastructure is installed and/or connections to the grid may be screened under Annex II. The Bank will require in those cases to be informed of the screening decision from Competent Authority. The project is expected to have a positive effect on the environment. The project will power electric vehicles with no emissions of pollutants and hence will contribute to meet air quality standards as set out by the European Union (EU) and the World Health Organization (WHO). The project will also contribute to reduce road transport noise pollution, as EVs are also much quieter than conventional vehicles. Finally, the project will have a significant impact on carbon dioxide (CO2) emissions reduction that will result from the replacement of conventional cars operating on fossil fuels with electric cars powered by less carbon intensive electricity. No major social issues are envisaged; nonetheless social impact of the project will be further assessed during the appraisal.

The promoter has been assessed by the EIB as being a private company sitting outside regulated activity of its parent company and hence not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - EV CHARGING ITALY (FM)
Date de publication
5 Nov 2019
Langue
Sujet général
Prêts
Numéro du document
94696696
Thématique du document
Information Environnementale
Numéro du projet
20190230
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes