CONCESSION FERROVIAIRE NANCY-CONTREXEVILLE

Signature(s)

Montant
89 609 600 €
Pays
Secteur(s)
France : 89 609 600 €
Transports : 89 609 600 €
Date(s) de signature
28/06/2024 : 89 609 600 €
Lien vers la source

Fiche récapitulative

Date de publication
6 septembre 2023
Statut
Référence
Signé | 28/06/2024
20220012
Nom du projet
Promoteur – Intermédiaire financier
CONCESSION FERROVIAIRE NANCY-CONTREXEVILLE
REGION GRAND EST
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 115 million
EUR 230 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the modernisation and upgrade of railway line between Pont-Saint-Vincent and Vittel ("Region Grand Est"), as well the construction of a railway depot for maintenance of passenger rolling stock.

The aim is to increase the quality of rail services and promote rail travel in the region, increase road safety while reducing the circulation of private vehicles, with consequent positive impacts on the local environment. Being located in one of the EIB Cohesion Priority Region (Grand Est), the project will contribute to sustainable transport and to regional development, line with EU and EIB policy objectives.

Additionality and Impact

The Region Grand Est (France) has selected a new public service operator (rail and bus) that will also be responsible for rehabilitating the existing Nancy-Contrexeville railway line that had been partially closed in December 2016 and meeting the output requirements of the 'Contrat de Concession de service public'. This concession tender is structured on the basis of vertical integration of rail infrastructure and services, through a form of public-private partnership, a new operational model that the French Regions are allowed to deploy on the Lignes Ferroviaires de desserte fines des territoires (LDFT), that are usually not part of the TEN T network. The Nancy- Contrexeville line is not part of the TEN-T railway network.

 

The concession covers the modernization and upgrade of the railway line, as well as the construction of a new railway depot for maintenance of passenger rolling stock to enable the restoration of rail services on the 89 km route from Nancy to Mirecourt, Vittel and Contrexéville. The concession also includes the operation of related replacement bus services. The Région Grand Est has requested a transfer of responsibility for this line under the Loi d'Orientation des Mobilités adopted on December 24, 2019 (article 172 law n°2019-1428) and which came into force around 12 months later property of this line under a legal regime created in 2014 and completed in 2022 (law "3DS" n° 2022-217).

 

The winning bidder is required to finance and rehabilitate of the 81 km section between Jarville, Pont-Saint-Vincent and Vittel as well as build a new railway depot for maintenance of passenger rolling stock. The line will be operated under a 22-year concession, whereby the concessionaire will manage and maintain the newly modernised line, stations along the line as well as operate passenger rail connections between Nancy, Jarville, Vittel and Contrexéville.

 

The rolling stock to be used for the passenger services will be provided by the Authority.

Aspects environnementaux
Passation des marchés

By helping the regional railways to maintain and increase modal share, the project will also contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate change mitigation. The EIB will ensure that the project complies with the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) and EIA aspects will be reviewed during appraisal. Potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised.

The Region Grand Est has launched an open tender for provision of railway services one line Nancy - Contrexéville including modernisation and upgrade of the infrastructure, as per Regulation (EC) No 1370/2007. The future "concessionaire" may be a private company not being subject to EU rules on public procurement. However, if at project appraisal, the EIB were to conclude that the "concessionaire" and/or the entities procuring the project contracts are subject to the EU public procurement legislation then the EIB will require that contracts for implementation of the project be tendered in accordance with the applicable EU procurement legislation (Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
24 août 2023
28 juin 2024
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - CONCESSION FERROVIAIRE NANCY-CONTREXEVILLE
Date de publication
3 Oct 2023
Langue
Sujet général
Prêts
Numéro du document
157242342
Thématique du document
Information Environnementale
Numéro du projet
20220012
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes