Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    23 592 321,51 €
    Pays
    Secteur(s)
    Espagne : 23 592 321,51 €
    Industrie : 2 595 155,37 €
    Aménagement urbain : 20 997 166,14 €
    Date(s) de signature
    21/12/2022 : 2 595 155,37 €
    21/12/2022 : 20 997 166,14 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    30 octobre 2022
    Statut
    Référence
    Signed | 21/12/2022
    20220195
    Nom du projet
    Promoteur – Intermédiaire financier
    NAVARRA SOCIAL HOUSING II FL
    NAVARRA DE SUELO Y VIVIENDA SA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 25 million
    EUR 54 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project consists of a Framework Loan (FL) comprising the co-financing of new energy efficient social housing units for rent. It also includes the upgrade and refurbishment of existing housing, including but not limited to social housing, with the objective to achieve high-energy performance standards.

    The aim is to improve social inclusion and integration, as well as the enhancement of the living standards of vulnerable populations, including the reduction of the energy demand through high energy efficient housing.

    Additionality and Impact

    The Project is in line with the provisions of the 2022 Nice Declaration on Housing, the 2020 New Leipzig Charter, the EU Urban Agenda, and the EIB Urban Lending Review. Furthermore, it is aligned with the EU Energy Performance of Building Directive and with the Bank's Energy Lending Policy for new buildings. This Project is deemed aligned to the EIB Gender Equality Strategy and Action Plan. Finally, it is compliant to a low carbon and resilient pathway, consistent with the Paris Agreement goals and principles. It will count fully towards the Bank's Climate Action and Environmental Sustainability targets.


    The Project will contribute directly to promote progress towards multiple Sustainable Development Goals (SDGs). Furthermore, the Project (89% of the PIC) is expected to fulfil the social sustainability criteria, being thus eligible under the Bank's SAB guidelines.


    The Project addresses a number of market failures, in particular the lack of available social housing supply as the market does not sufficiently cater for the demand of low-income people. The Project also addresses sub-optimal investment flows into highly energy efficient and resilient new buildings.

    Given the track record of Nasuvinsa as a best in class Promoter for the implementation and operation of social housing projects, together with the evidence of solid demand and its contribution to the socio-economic inclusion of lower-income citizens, this operation can be expected to combine excellent economic and acceptable financial performance for the social housing sector, justifying therefore the Bank's involvement.


    The availability of long-term finance for social housing at affordable interest rates is as a key contribution of the Bank, considering the very long-term nature of the investment and its positive impact on overall project cost.


    The EIB loan will include flexible drawdown terms and conditions adjusted to the investment horizon of the projects.


    The Project was structured as a framework loan as per the advice of the services so that the promoter would gain in flexibility with regards to the schemes to be included in the scope of the operation. Hence, both ad hoc interventions and a continuous dialogue with the promoter are expected. This includes monitoring missions to ensure compliance with disbursement conditions or annual monitoring reports.

    Aspects environnementaux
    Passation des marchés

    The compliance with the relevant EU Directives will be verified during appraisal and at allocation stage: Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. In addition, EU Directive 2010/31/EU on Energy Performance of Buildings. The level of climate action (adaptation and mitigation) and environmental sustainability measures where relevant, will be assessed during appraisal and at allocation stage.

    The Bank will require the Promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU, 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    À l'examen
    Approuvé
    Signé
    15 novembre 2022
    21 décembre 2022
    Projets associés
    Lien vers la source
    Fiche récapitulative
    Autres liens

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - NAVARRA SOCIAL HOUSING II FL
    Date de publication
    26 nov. 2022
    Langue
    Sujet général
    Prêts
    Numéro du document
    157317541
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220195
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes