Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

PROTIX (IEU GT)

Signature(s)

Montant
37 000 000 €
Pays
Secteur(s)
Pologne : 37 000 000 €
Industrie : 37 000 000 €
Date(s) de signature
22/12/2023 : 37 000 000 €
Lien vers la source
Fiche technique

Fiche récapitulative

Date de publication
6 septembre 2023
Statut
Référence
Signé | 22/12/2023
20220349
Nom du projet
Promoteur – Intermédiaire financier
PROTIX (IEU GT)
PROTIX BV
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 37 million
EUR 165 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance the construction and operation of an insect breeding, rearing and processing plant to produce animal feed material in Poland. In particular, the plant will use low-grade agriculture and agri-food residues streams as feedstock to produce high-value and highly nutritional quality products for the animal feed and pet food industries. The unit is planned to upcycle around 270ktonnes of low-grade stream from surrounding agro-industries into 60ktonnes of Live Larvae Equivalent of proteins, lipids and organic fertilizers.

The aim is to deploy and operate a technology-built facility for insect breeding, rearing and processing at industrial scale. The related technology has already been developed by the promoter and deployed at commercial scale in the Netherlands. The investment is expected to generate significant social economic benefits, mainly on account of its circularity features and a reduced environmental and carbon footprint compared to the production of conventional feeds/food. Furthermore, the deployment of the technology will increase the overall resource efficiency of the promoter's existing industrial activities.

Additionality and Impact

The operation, under Thematic Green Transition, is in line with the InvestEU objective of Sustainable Bioeconomy. It concerns the financing of an innovative commercial scale insect farm operation in Poland.

The innovativeness of the project, lies in its capacity to integrate the entire production process from the insect nursery, rearing and processing, to the final product which is high value proteins and lipids for the feed industry and fertilizers, as a by-product for soil enhancer. The project is a scale-up of a commercial pilot designed and operating in the Netherlands. The project is fully aligned with key EU policies, namely the Farm to Fork strategy as part of the Green Deal, the Bioeconomy Strategy and action plan and the Circular Economy Strategy.

The operation will contribute to the deployment of a production technology, upcycling low grade stream form surrounding agro-industries, hence lowering environmental footprint of feed and food production systems. It therefore reduces negative environmental externalities compared to produce that it will most likely substitutes i.e. soy protein and oil. Furthermore, the operation will address the market failure of access to finance for new SMEs without a track record and in an innovative sub-sector of the bioeconomy.

The development of an efficient insect farming new technology will result in the generation of positive knowledge externalities. The project is considered 100% circular based on a number of qualities. The insect facility will generate positive social impacts through the creation of new skilled employment and technology in a transition region of Poland. The operation faces implementation risks associated with the scaling-up from a smaller industrial scale facility into a large facility, which will be the largest insect farm in Poland and one of the largest in Europe. Unmitigated operational risks include market risks (i.e. insufficient consumer demand) and high bargaining power of clients (large feed producers). The management team is deemed to have the skills and experience to manage the implementation and operational risks. The Promoter is a new client for the EIB. EIB's involvement provides additional financial flexibility, diversifies the funding base, and unlocks long term funding for the implementation of this project, which would not be otherwise accessible to the Company via commercial banks. It also provides a signalling effect to other investors in the market supporting future fund raising.

The project would not have been carried out (to the same extent) by the EIB without the InvestEU support.

Aspects environnementaux
Passation des marchés

Compliance with the Environmental Impact Assessment (EIA) directive 2014/52/EU amending the EIA Directive 2011/92/EU) will be assessed during appraisal, as well as well compliance with and other applicable environmental acquis.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
21 décembre 2023
22 décembre 2023
Projets associés
Lien vers la source
Fiche récapitulative
Autres liens

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - PROTIX (IEU GT)
Date de publication
23 Jan 2024
Langue
Sujet général
Prêts
Numéro du document
175209442
Thématique du document
Information Environnementale
Numéro du projet
20220349
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Autres liens
Fiche récapitulative
Fiche technique

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes