Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Fiche récapitulative

Date de publication
29 janvier 2025
Statut
Référence
À l'examen | 06/02/2024
20220715
Nom du projet
Promoteur – Intermédiaire financier
GREENLAND HYDRO POWER PLANT
NUNAGREEN CONSTRUCTION A/S
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
not disclosed
not disclosed
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The Framework Loan supports the greenfield hydropower construction programme deriving from Greenland Energy Sector Plan. The project encompasses the construction of 76MW Buksefjord-3 hydropower plant (Buks-3 HPP) between Ista lake and Kang lake, approximately 30km east of existing 45MW Buksefjord-1 HPP, and associated infrastructure.

The project implementation period is 2025-2031. Once completed, the project will increase the available green generation by around 515 GWh/a. It will provide with partial redundancy of the power supply to Nuuk and full redundancy, should Nukissiorfiit, the Greenlandic utility decide for a second 60km backup transmission line from Buksefjord to Nuuk. Once new hydropower capacity will be made available, Nukissiorfiit intends to use existing baseload diesel generators as backup and decommission outdated backup diesel generators dating from 1970's.

Aspects environnementaux
Passation des marchés

The hydropower plant and the related facilities such as transmission items, roads and water tunnels included in the project scope, are currently subject to an Environmental Impact Assessment (EIA) process. The environmental permit is expected to be delivered to the Buksefjord HPP after end 2024 when the EIA has been completed. The EIA Report for the Buksefjord HPP (including a section on heating system conversion impacts) was submitted to the public consultation phase in mid-2023, after being reviewed by an external consultant hired by the Authorities. However, following a major design change of the project layout, the EIA process will be complemented and amended as required by the Greenlandic legislation. Moreover, should the Promoter decide to request financing for the second 60km backup transmission line from Buksefjord to Nuuk, the component will follow a screening process depending on the design parameters adopted. The EIA Reports will be reviewed in terms of compliance with the content and necessary information and data against Annex 2a of the EIB Standard 1. The hydropower and related facilities are not located in habited areas and are unlikely to affect negatively local population livelihood. The Bank has hired an external consultant for project appraisal and will review the project's potential impacts and avoided CO2 amount at appraisal stage or upon new allocation request under the framework loan. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation.

Greenland is an independent Danish territory outside the EU and whose procurement law is based on Danish law. Greenlandic procurement regulation is deemed to be in line with relevant EU directives. The Borrower is a private company, fully owned by the Greenland Government, that will benefit from exclusive rights by leasing the assets with a fixed return on investment to Nukissiorfiit, the state-owned electric utility company. Therefore, the Borrower shall follow the public procurement procedures outside EU set in the Bank's Guide to Procurement. The promoter is assisted by an external consultant with relevant procurement knowledge. A new Buksefjord HPP tender process will take place in end 2024.

Commentaires

Greenland currently implements its "Sector Plan for Energy and Water Supply from 2018" with 35 goals of which decarbonising the electricity and district heating sector to achieve an 85% share of green production by 2030. The sector plan translated into the Greenland Parliament Act no. 22 of 1. December 2021 and the decision to implement the project. Besides the Government of Greenland is drafting a new strategic vision for energy and climate, to be ready in 2024. Greenland wants to reinforce its green strategy and sees opportunity to develop hydrogen production from oversupply of hydropower plants. Hydrogen could be used in Greenland's fish industry (boat fuel) and to replace oil fuel for power and heat production in small remote settlements where renewables are not viable to achieve 100% green energy production.

Milestone
À l'examen
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes