Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
70 000 000 €
Pays
Secteur(s)
Allemagne : 70 000 000 €
Industrie : 70 000 000 €
Date(s) de signature
22/12/2023 : 70 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
10 juillet 2023
Statut
Référence
Signé | 22/12/2023
20230115
Nom du projet
Promoteur – Intermédiaire financier
SUNFIRE SOLID OXIDE ELECTROLYSER
SUNFIRE GMBH
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 100 million
EUR 214 million
Lieu
Secteur(s)
Description
Objectifs

The project will finance research and development related to solid-oxide (SOEC) electrolysers and the required capital expenditures for its early production capacity.

The aim is to contribute to develop EU-based hydrogen industry, for which it can be considered an enabler. The project caters for the transition to a hydrogen economy, thereby supporting the competitiveness and climate ambitions of the EU heavy industry. Due to its enabling character for the transition to a hydrogen economy, the project fully contributes to Climate Action (mitigation) objective. It meets the objectives of the Green Deal Industrial Plan proposed by the European Commission. The Project is located in a Cohesion Region, where it will create significant long-term skilled employment.

Additionality and Impact

The Project fulfills the InvestEU objective of "Research, development and innovation", notably through projects that contribute to the objectives of Horizon Europe and research in the field of key enabling technologies (KETs) and their industrial applications.". It is also eligible under both the EIB's "Innovation, Digital and Human Capital" and "Climate Action" objectives respectively as it concerns the implementation of an innovative advanced manufacturing facility in the EU, creating significant long-term skilled employment, and it caters for the transition to the "hydrogen economy" which will be key to support the climate-neutral ambitions of the EU heavy industry. It is located in a Cohesion Region.

 

Sunfire is exposed to higher levels of risks associated to the nascent hydrogen supply chain, which is required to scale-up quickly in anticipation of regulation-driven future market demand, in order to timely contribute to the EU's climate objectives. The high failure rate of similar ventures in combination with its high financing needs, make for a risk proposal that is at the high end of the spectrum even for most commercial venture capital investors.

 

The equity-type venture debt that EIB provides is complementary to equity financing, as it (i) minimizes further dilution of existing shareholders; (ii) provides for longer tenors than usually associated to commercial venture debt; and (iii) is for an amount, thanks to the support of the InvestEU guarantee, that is meaningful, compared to Sunfire's liquidity needs. As the Company, over time, realizes its growth ambitions, the presence of the EIB provides for a signalling effect and may catalyse Sunfire's first access to commercial long-term debt markets.

 

The EIB's equity-type venture debt will feature performance-linked elements and effectively share in the upside of the venture. EIB will also share in the downside as the investment will be materially exposed to the risk of the Sunfire venture (including high technical, market and financial risks).

 

The EIB would not be able to provide such type of financing support during the period in which the EU guarantee can be used, or not to the same extent, without InvestEU.

Aspects environnementaux
Passation des marchés

The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation. As an extension of existing industrial plants but within their physical boundaries, the project does not fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by Directive 2014/52/EU) and an EIA process is not required. Where and if applicable, the requirements of the EIA, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC (to be completed as relevant/applicable) and the requirements of social standards will be verified during appraisal. The Industrial Emissions Directive 2010/75/EU applies.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation, such rules will have to be applied.

Milestone
À l'examen
Approuvé
Signé
15 novembre 2023
22 décembre 2023
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - SUNFIRE SOLID OXIDE ELECTROLYSER
Date de publication
17 Nov 2023
Langue
Sujet général
Prêts
Numéro du document
177724730
Thématique du document
Information Environnementale
Numéro du projet
20230115
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes