Date de publication
5 septembre 2023
Statut
Référence
Approuvé | 18/10/2023
20230366
Nom du projet
Promoteur – Intermédiaire financier
SOUTH-WEST EUROPE RENEWABLE ENERGY PF ENVELOPE
ACCEPTABLE CORPORATE(S)
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 1000 million
EUR 2400 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The lending envelope will support mid-sized greenfield wind and solar plants projects to be carried out by private companies in South-West Europe, mainly Spain, Italy, Portugal, Ireland and France.

The aim is to enhance access to loan finance to the projects' promoters to support their investments in the field of renewables.

Additionality and Impact

The project falls under the InvestEU objectives as it concerns the generation, supply or use of clean and sustainable renewable and safe and sustainable other zero and low-emission energy sources and solutions.


This operation increases renewable energy generation capacity in the EU and contributes to the EU 2030 climate objectives. The financing of this operation is in line with the Bank's lending priority objectives on Renewable Energy as well as on Climate Action, Environmental Sustainability and Social and Economic Cohesion. Furthermore, this operation will contribute towards the Bank's objective in the context of the REPowerEU Plan.


The operation will result in the financing of multiple renewable energy projects, each of them producing electricity from low carbon sources (onshore wind and solar PV plants). This will address the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and other air pollution (compared to fossil-fuel generation).


The sub-projects will likely rely on revenues from the market at least in part (the wholesale market and unsubsidised commercial PPAs), in a sector characterised by incomplete markets (illiquid intraday markets, limited forward/hedging markets, lack of scarcity pricing and lack of transmission pricing). It thereby contributes to the policy objective to support the market integration of renewable energy projects


A number of the to-be-financed projects are expected to be located in EIB Cohesion Priority regions.


EIB's support to a large number of renewable energy projects will have a strong signalling effect and shall crowd-in other financiers, which is particularly relevant in a landscape of enhanced targets of renewable energy generation capacity under REPowerEU.

 

The Bank's financial contribution to the sub-projects will be delivered under numerous forms: construction bridge facilities taking full merchant risk, or long-term Project Finance structures with an extended exposure to merchant risk after expiration of sub-projects Power Purchase Agreement, are offered by a limited number of lenders only, due to the volatility of electricity price coupled with uncertainty of revenue cannibalisation over a long time horizon. The EIB is committed to deliver such tailor-made structures at the best possible financial cost, in an environment of high interest rates, bringing financial value to the sub-projects.


Sub-projects, included in the Framework Operation and presented under InvestEU, would not have been carried out (to the same extent) by the EIB without the InvestEU support.

Aspects environnementaux
Passation des marchés

The EIB will require that sub-projects financed under this lending envelope comply with the domestic and EU applicable legislation, as appropriate. Solar photovoltaic and onshore wind plants are expected to fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by Directive 2014/52/EU, leaving it to the competent authority to determine based on the criteria listed in Annex III whether an environmental impact assessment report is required. Some associated transmission lines could fall under Annex I. The EIB will assess compliance with applicable EU Directives during the appraisal of each sub-operation, in particular concerning cumulative impacts and potential impacts on nature conservation sites.

The EIB will require that sub-projects financed under this lending envelope comply with the domestic and EU applicable legislation, as appropriate. The promoters are expected to be private companies and the schemes envisaged for this operation are market-based renewable energy projects, which do not enjoy any special or exclusive rights. Therefore, private sector procurement procedures should apply. This will be further reviewed during the appraisal of each sub-operation.

Milestone
À l'examen
Approuvé
18 octobre 2023
Projets associés
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - SOUTH-WEST EUROPE RENEWABLE ENERGY PF ENVELOPE
Date de publication
20 Oct 2023
Langue
Sujet général
Prêts
Numéro du document
172316054
Thématique du document
Information Environnementale
Numéro du projet
20230366
Secteur(s)
Disponible au public
Télécharger maintenant
Autres liens
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project
Related sub-project

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes