Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    70 000 000 €
    Pays
    Secteur(s)
    Italie : 70 000 000 €
    Eau, assainissement : 17 500 000 €
    Déchets solides : 52 500 000 €
    Date(s) de signature
    27/05/2024 : 17 500 000 €
    27/05/2024 : 52 500 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    14 septembre 2023
    Statut
    Référence
    Signé | 27/05/2024
    20230380
    Nom du projet
    Promoteur – Intermédiaire financier
    ETRA WATER & CIRCULAR ECONOMY
    ETRA SPA SB
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 100 million
    EUR 254 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    Description
    Objectifs

    The project, part of ETRA's 2023-2027 investment programme, concerns the implementation of different schemes of circular economy and solid waste, as well as water sector.

    The project concerns the implementation of different schemes of the Circular Economy (CE)/Solid Waste (SW), and the water sector. The CE/SW project components include the acquisition of collection equipment (underground containers, semi-trailers, compactors, bio-methane powered trucks, etc.). It also consists of the upgrading of the Anaerobic Digestion (AD) plant located in Bassano del Grappa into biomethane; the construction of two new composting lines into the actual AD plant located in Camposampiero; the revamping of a paper recycling unit in Campodarsego; the retrofitting of a composting unit in Bassano del Grappa and another composting plant in Camposampiero; the upgrading of an existing plastic sorting plant. Moreover, it comprises also the construction of four new sorting stations dedicated to recycling material. Finally, the CE/SW project component comprises the upgrading of the gas and leachate treatment system of a closed landfill. As far as the water sector component is concerned, it consists of the maintenance of tanks and the revamping of 158 km of drinking water infrastructure. It comprises also the revamping of the "centrale di Oliero". Finally, this component includes the construction of new conveyance/water networks and the upgrading filtration system.

    Additionality and Impact

    The Project is in line with the InvestEU objective of Environment.

    By strengthening the recycling rate and increasing the renewable energy ratio in the Veneto region, the Project aligns with the European Union's legal requirements, Circular Economy Action Plan, and the Green Deal.

    In addition, it supports the supply and processing of raw materials, space, oceans, water, including inland waterways, waste management in line with the waste hierarchy and the circular economy; nature and other environment infrastructure. The circular value recovery contribution of the Project, as defined in the European Commission's Categorisation system for the circular economy, makes it, alongside with other criteria, eligible for an InvestEU guarantee. The Project will contribute to the Bank's policy objectives of Sustainable Energy and Natural Resources, as well as horizontally to Climate Action and Environmental Sustainability. The Project will also contribute to improving the efficiency of the potable water supply system while increasing its resilience against climate related risks.

    The Project will address a sub-optimal investment situation in water and waste infrastructure in the Veneto Region in Italy. In doing so, it will ensure compliance with key European regulations in the water sector and improve the quality and resilience of water services.

    The Project will address several market failures, including those associated with public goods, unaccounted for externalities and information failures, generating positive health and environmental benefits, which would not be realised to the same extent without public intervention.

    The Project addresses a few additional market failures by reducing greenhouse gases; by protecting the environment, public health, and saving energy as well as costs related to environmental protection. With this Project, the EIB financing will help to reduce negative externalities while strengthening the positive externalities for the targeted regions. The EIB long-term financing will be addressing a market failure in relation to the provision of finance in the size and tenors needed to carry out the investment backlog of Projects to provide water and solid waste-essential services at affordable prices for the population.

    The Bank's support acknowledges the positive externalities of recycling and leverages much needed public backing, including an InvestEU guarantee, for a circular - sustainable infrastructure - public sector undertaking.

    The EIB loan will provide key support, ensuring optimal funding conditions in terms of cost and tenor, diversifying the borrower's funding base and potentially attracting other co-lenders to the Project.

    Given the counterpart's relatively small size and low capital levels, the EIB would not be able to provide financing support, to the same extent without InvestEU. The guarantee substantially enhances the EIB contribution in terms of loan amount, tenor, and risk structure (unsecured).


    Aspects environnementaux
    Passation des marchés

    The project is in line with the main European Directives on environmental protection. As regards the solid waste component, the project complies strictly with the hierarchy of waste management methods defined in the European Economy Package, in particular the Landfill Directive 2018/850 (Directive 1999/31/EC as amended); the Waste Framework Directive 2018/851 (Directive 2008/98/EC as amended). With respect to the water component, the project is fully in line with the Directive 2000/60/EC (Water Framework Directive). The Promoter will be required to act in accordance with the provisions of the relevant EU Directives, including the EIA (2014/52/EC amending Directive 2011/92/EU), Habitats (92/43/EEC) and Birds (2009/147/EC) Directives.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Milestone
    À l'examen
    Approuvé
    Signé
    26 mars 2024
    27 mai 2024
    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - ETRA WATER & CIRCULAR ECONOMY
    Date de publication
    20 mars 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    195904743
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230380
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes