CESKE DRAHY ROLLING STOCK MODERNISATION III

Signature(s)

Montant
302 110 052,07 €
Pays
Secteur(s)
Tchéquie : 302 110 052,07 €
Transports : 302 110 052,07 €
Date(s) de signature
25/10/2024 : 48 237 623,76 €
12/08/2024 : 253 872 428,31 €
Lien vers la source

Fiche récapitulative

Date de publication
13 septembre 2023
Statut
Référence
Signé | 12/08/2024
20230463
Nom du projet
Promoteur – Intermédiaire financier
CESKE DRAHY ROLLING STOCK MODERNISATION III
CESKE DRAHY AS
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
CZK 7610 million (EUR 309 million)
CZK 19910 million (EUR 808 million)
Lieu
Secteur(s)
Description
Objectifs

Acquisition of 20 new locomotives and 182 coaches, as well as retrofit of around 191 units of existing fleet with European Rail Traffic Management System (ERTMS).

The new rolling stock is expected to contribute to reducing the journey time, promoting more efficient operation, reducing maintenance costs, lowering energy consumption and increasing the level of comfort for passengers. By improving the quality of service and extending the rail service to new destinations, the new rolling stock is expected to help railways compete with other modes, particularly private vehicles, so as to maintain or improve its modal share. Shifting passenger flows from other modes to rail may result in reduced vehicle operation costs, safety and environmental benefits. By installing ERTMS and contributing to achieving interoperability of the EU railways system, the project is expected to improve reliability, frequency of the services and safety.

Additionality and Impact

The Project consists of the acquisition by Ceske Drahy of 20 electric locomotives and 180 coaches in order to replace age expired units operating international connections, and also allow for extension of these routes where the trains operate to new destinations. The scope includes also ERTMS (European Rail Traffic Management System) retrofit of 219 pieces of rolling stock.

The new rolling stock will contribute to reducing the journey time, promoting more efficient operation, reducing maintenance costs, lowering energy consumption and increasing the level of comfort for passengers. By improving the quality of service and extending the rail service to new destinations, the new rolling stock will help railways compete with other modes, particularly private vehicles, so as to maintain or improve its modal share. Shifting passenger flows from other modes to rail may result in reduced vehicle operation costs, safety and environmental benefits.

By installing ERTMS and contributing to achieving interoperability of the EU railway system, the project is expected to improve reliability, frequency of the services and safety.

The EIB financing will contribute to diversifying Ceske Drahy's funding sources and increasing the average maturity of its debt, thus strengthening its capacity to undertake its future investment plans.

Aspects environnementaux
Passation des marchés

The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
28 mai 2024
12 août 2024
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - CESKE DRAHY ROLLING STOCK MODERNISATION III
Date de publication
24 Jul 2024
Langue
Sujet général
Prêts
Numéro du document
171667764
Thématique du document
Information Environnementale
Numéro du projet
20230463
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes