Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
95 000 000 €
Pays
Secteur(s)
Grèce : 95 000 000 €
Éducation : 95 000 000 €
Date(s) de signature
20/03/2025 : 95 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
20 mars 2024
Statut
Référence
Signé | 20/03/2025
20230788
Nom du projet
Promoteur – Intermédiaire financier
UNIVERSITY OF CRETE - STUDENT ACCOMMODATION PPP
HELLENIC REPUBLIC
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 100 million
EUR 243 million
Lieu
Secteur(s)
Description
Objectifs

The project concerns the design, construction, financing and operation of student accommodation and other facilities for the University of Crete using the public-private partnership (PPP), design-build-finance-operate-maintain (DBFOM) procurement method.

The aim is to create student accommodation in areas with acute shortages, providing increased amounts of lower cost accommodation that enables students from lower-income families to access higher education and decreasing living costs for some students in these locations. The project will also create new educational infrastructure to address existing shortages in teaching space. The University of Crete aims to further improve the quality and relevance of the teaching in the higher education sphere, which has been blighted by under investment nationally, in particular during the years following the financial crisis.

Additionality and Impact

The project falls under the social investments eligible area of the Annex II InvestEU Regulation. It addresses a sub-optimal situation with regard to investments in higher education and teaching infrastructure. It creates additional, much needed space in student residences, as well as for teaching activities at the University of Crete, being in line with the European Education Area and the European Research Area. Moreover, the University is located in the less developed & Just Transition Mechanism area of Crete, i.e. outside the main population and educational hubs of Athens and Thessaloniki. Therefore, the success of this project will contribute to better-balanced territorial development, counteracting excessive concentration, strengthening secondary growth poles and reducing inequalities between people and between places.


The Project will be delivered with the PPP procurement method in an effort to better manage construction and operation risks by transferring and sharing them with the private sector. A successful outcome with the assistance of the Bank, its co-lenders and their advisors will strengthen the capacity of the University of Crete to manage complex projects and financing methods diversifying their procurement and related funding options.


The participation of EIB in the Project from the initial steps of the PPP tender, has been seen as important by the University and the PPP Unit of the Greek Ministry of Economy and Finance, due to the technical and financial contribution it would offer. In terms of technical contribution, the Bank has reviewed the technical specifications and encouraged the Promoter to increase its ambition regarding the energy performance of the proposed facilities. Within the same context, design measures related to all other climate change and environmental sustainability objectives were presented. The InvestEU Advisory Hub is providing technical assistance, aiming at providing horizontal support and capacity building in the process of the University's internal preparation to manage the public private partnership (PPP) contract post award. This ability is crucial for maximizing the benefits of a PPP structure.


The participation of EIB assisted the Awarding Authority/Borrower/Sponsor and our Co-Lender to arrange a PPP Project and a PF financing on the basis of sound international principles and practices. This will also help procurement and execution of future PPP Projects in Greece. The financial benefit delivered by the Bank will be shared as per the tender documents between the Private and Public Sector counterparts and is assisting the economic and financial sustainability of the Project at a critical time (due to the inflationary conditions that emerged in the aftermath of the Covid-19 pandemic and the Ukraine/Middle East war conflicts).

Aspects environnementaux
Passation des marchés

The project covers facilities of a kind that are not specifically mentioned in the environmental impact assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU, though the project is covered by Annex II of the Directive in relation to urban development. The project will be developed in two of the University of Crete campuses, which have been assessed for their impact on the environment, and the competent authorities have issued positive decisions. It includes new buildings which will comply with the 2010/31/EU Directive and will potentially deliver facilities with higher energy performance compared to the nearly zero-energy building (NZEB) requirements in national measures. The project is located in a less developed region as defined by the EU cohesion policy and is expected to support the strengthening of the EU's economic, social and territorial cohesion. The project concerns investments in the accessibility and quality of a university located outside Greece's economic, population and educational hubs of Attica and Central Macedonia, thereby contributing to better-balanced territorial development, counteracting excessive concentration, strengthening secondary growth poles, and reducing inequalities between people and between places.

The promoter has to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Contract notice was published in the OJEU with reference number 2019/S 208-506482.

Milestone
À l'examen
Approuvé
Signé
21 novembre 2024
20 mars 2025
Projets associés
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Évaluation des incidences environnementales et sociales - UNIVERSITY OF CRETE - STUDENT ACCOMODATION PPP - Iraklio Campus
Date de publication
19 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
187530615
Thématique du document
Information Environnementale
Numéro du projet
20230788
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Évaluation des incidences environnementales et sociales - UNIVERSITY OF CRETE - STUDENT ACCOMODATION PPP - Rethymno Campus
Date de publication
19 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
187533359
Thématique du document
Information Environnementale
Numéro du projet
20230788
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Fiche technique sur les aspects sociaux et environnementaux - UNIVERSITY OF CRETE - STUDENT ACCOMMODATION PPP
Date de publication
26 Nov 2024
Langue
Sujet général
Prêts
Numéro du document
214351765
Thématique du document
Information Environnementale
Numéro du projet
20230788
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes