Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20010528
Date de publication: 23 janvier 2002

Promoteur – Intermédiaire Financier

Schiphol Group

Lieu

Description

Construction of a fifth runway and associated infrastructure: The new north-south runway, at 3 800 m long and 60 m wide will be capable of accommodating aircraft operating on long-haul routes and will be operable in all weather conditions.

Objectifs

The fifth runway will make an essential contribution in meeting environmental constraints of the airport, as it will significantly reduce the amount of noise in surrounding residential areas while ensuring the continued development and growth of the airport.

Commentaires

Airport operations

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 382 million

Aspects environnementaux

Full EIA procedures have been undertaken prior to planning approval including an extensive public enquiry process.

Passation des marchés

Past procurement procedures followed open procedures and were advertised in the OJEC consistent with EC Directives. Future contracts will be advertised and tendered in accordance with these directives.

Statut

Signé - 3/10/2002

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Transports