Référence: 20020488
Date de publication: 26 mars 2003

Promoteur – Intermédiaire Financier

Hamburger Stadtentwässerung, Hamburg (HSE). HSE is a regional water authority, established in 1995 by the city-state of Hamburg as a legally independent company under public law. Before 1995, it legally operated as a department within the administration of Hamburg.

Lieu

Description

The project comprises a large number of single schemes to improve Hamburg’s wastewater services, through reconstruction and upgrading of old system components. The project involves the modernisation of the wastewater treatment system of the city-state of Hamburg.

Objectifs

Like the first Hamburg Abwasser Project, the second aims at the reduction of environmental disturbances for Hamburg’s residents and the urban infrastructure system by adopting a proactive approach in network reconstruction and rehabilitation in line with the continuously up-dated 20-year rehabilitation programme. The project concerns a large number of smaller investments in different sewer catchment areas within the area of responsibility of HSE and in its treatment works.

Commentaires

Environment

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to 43% of project costs, up to EUR 180 million

Coût total (montant approximatif)

Up to EUR 420 million

Aspects environnementaux

At the time of appraisal of the Hamburg I project, canalisation works underwent Annex II of the EU Directive 85/337/EEC. Since 1999 the EIA Directive was amended by 97/11/EEC, which does not list sewers any more under Annex II. Thus no legal obligation exists for most project components of this Hamburg II project to be evaluated against environmental impacts. However, the HSE approach as far as environmental impacts are concerned will be examined during appraisal. The promoter’s procurement procedures will be examined during appraisal.

Passation des marchés

In respect of procurement for public works, European Union Directives.

Statut

Signé - 3/03/2004

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Eau, assainissement