Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20020489
Date de publication: 15 septembre 2003

Promoteur – Intermédiaire Financier

Société Tunisienne de l’Électricité et du Gaz (STEG)

Lieu

Description

The planned investment focuses mainly on: i) exploiting the LPG associated with gas production in fields in the south of the country (upgrading of the Gabès LPG plant, construction of a compressor station in Gabès); ii) increasing the capacity, flexibility and security of the gas transmission network ( rehabilitation of the El Borma-Gabès gas line, construction of feeder and grid gas lines); iii) extending public gas distribution in the areas covered by the main gas transmission network; and (iv) upgrading metering stations and installing a SCADA system for the gas transmission and distribution networks.

Objectifs

The project forms part of the Tenth National Plan (2002-2006). It is included in the Tunisian Government’s priority programme to rehabilitate and upgrade its gas supply, transmission and distribution network, and to improve its safety and management. By contributing to the development of energy supply in Tunisia, particularly in the private sector, the project accords with the goals set under the Bank's FEMIP facility.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 55 million from the Bank's own resources under the EUROMED II Mandate (2002-2007).

Coût total (montant approximatif)

Approximately EUR 115 million

Aspects environnementaux

An evaluation of the project's environmental impact is required by Tunisian law (Decree 91-362), largely inspired by European Directive 97/11/EEC). Environmental impact studies, mitigating measures and their approval by the National Environment Agency (ANPE) are to be submitted to the Bank.

Passation des marchés

The contracts for the project's various components will be put out to international tender with publication in the OJEC.

Statut

Signé - 10/11/2003

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Tunisie Énergie