Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20050160
Date de publication: 15 juillet 2005

Promoteur – Intermédiaire Financier

  • Municipality of Budapest - Project Implementation Unit
    Office of the Mayor, 1052- Budapest, Városház utca 9-11. Hungary
    Mr. Dénes SIKLÓSI, Head of Project Implementation Unit
    Tel.: +36 (1) 327 1066
  • Budapest Transport Limited (BKV Rt.)
    H-1980 Budapest, POB 11. Hungary
    Mr. Zoltán DONÁTH, Deputy General Director
    Tel.: +36 (1) 461 6653

Lieu

Description

The project comprises BKV’s purchase of 22 new metro trains to operate on the existing metro line 2 (M2) and the upgrading of an existing depot. The new rolling stock will replace obsolete Russian type rolling stock, which is up to 35 years old.

Objectifs

The Budapest Public Transport Company (BKV) decided to buy new rolling stock to match the asset life of the currently rehabilitated infrastructure for M2, which will have an economic life of around 35 years after completion. The new vehicles will have a higher passenger comfort and energy efficiency.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Approximately up to EUR 85 million.

Coût total (montant approximatif)

Approximately up to EUR 174 million.

Aspects environnementaux

The construction of the new train sets will take place in the manufacturer's plants and is not covered by Annex I or II of EU Directive 97/11/EC. BKV has the intention of obtaining the ISO 9002 certification for operation of its metro lines and supports a sustainable environmental protection policy. BKV is also committed to continue improvements in environmental management and to achieve accreditation to the ISO 14001 standard in the near future. Overall the project will have a positive effect on the environment.

Passation des marchés

BKV is an organisation that is subject to EU public procurement directives. As required by these Directives, the tender notice for pre-qualification was published in the EU Official Journal (OJEU) on 06/06/2005.

Statut

Signé - 19/06/2006

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports