Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080226
    Date de publication: 17 mars 2010

    Promoteur – Intermédiaire Financier

    Infraco Limited, Electra S.A., Government of Cape Verde

    Lieu

    Description

    The project comprises the development, construction and operation of four onshore wind farms and all interconnections from the wind farms to the local 20 kV grid connection points and associated transmission infrastructure on the islands of Santiago (9.65 MW), Boa Vista (4.25 MW), Sal (7.65 MW) and Sao Vicente (5.95 MW) in Cape Verde. The wind farms will have a total installed capacity of 27.2 MW.

    Objectifs

    The project satisfies European Union and Bank policy objectives to encourage renewable energy generation and address the impacts on climate change resulting from the combustion of fossil fuels. It further falls under the scope of the environmental and economic development goals of the Cotonou Mandate. Indeed, by providing electricity from a renewable energy source at an affordable, economic cost, the project addresses two key objectives of the Bank's external lending mandate: environmental protection and improvement and security of energy supply. It furthermore supports private investments in a project of public interest.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 30 million.

    Coût total (montant approximatif)

    EUR 60 million.

    Aspects environnementaux

    If located in the EU, the project would fall under the scope of Annex II of the EIA Directive 85/337/EEC, as amended, requiring the competent authority to determine whether the project shall be made subject to an environmental assessment. According to Cape Verde national legislation (Decreto - Lei no. 29/2006), wind farms are subject to a mandatory environmental impact assessment with publication and public consultation.

    Passation des marchés

    The procurement procedures employed by the promoter have been reviewed by the Bank and were found to be acceptable.

    Statut

    Signé - 14/12/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Cap Vert Énergie