Recherche Fr menu fr ClientConnect

Recherches les plus fréquentes
Pages les plus visitées
Référence: 20080499
Date de publication: 29 septembre 2010

Promoteur – Intermédiaire Financier

Trafikverket

Lieu

Description

The construction of a double-track railway tunnel with 2 new stations beneath central Stockholm.

Objectifs

The tunnel will significantly improve the traffic throughput to and from south of Stockholm.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 0.6 billion.

Coût total (montant approximatif)

EUR 2.2 billion.

Aspects environnementaux

Given that an urban railway project falls under Annex II of the directive 85/337/EC, a competent authority decides on the requirement of an EIA and confirms that the project complies with the requirements of the EU nature conservation policy, according to the EU Birds directive (97/409/EEC) and the Habitat directives (92/43/EEC) and Nature 2000.

Passation des marchés

The project is subject to EU public procurement directives (2004/17/EC and 2004/18/EC).

Statut

Signé - 9/12/2010

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Suède Transports