Date de publication: 14 juillet 2009
Promoteur – Intermédiaire Financier
Private sector operation
Lieu
Description
The Boulevard Turistico del Atlantico (BTA) project involves the construction, as part of a 30 year Design Build, Finance and Operate (DBFO) concession contract, of a 123 km toll road in the Samaná peninsula in the north of the Dominican Republic. The project consists of the rehabilitation of 99 km of existing road (Nagua-Sánchez-Samana-El Limón-Las Terrenas) and the construction of some 24 km of new road from Las Terrenas to Majagual, close to the El Catey international Airport. The project is a natural extension of the Autopista de Nordeste (AdN) motorway, connecting the capital Santo Domingo with the tourist destinations on the Samaná peninsula.
Objectifs
The Samaná peninsula is regarded as a tourist destination with good potential and as such represents a priority of the DR Government. Both the AdN and BTA toll roads significantly reduce travel time between the capital, Santo Domingo, the El Catay international airport and the tourist destinations on the Samaná peninsula.
Secteur(s)
Montant BEI envisagé (montant approximatif)
USD 40 million.
Coût total (montant approximatif)
USD 167 million.
Aspects environnementaux
A full EIA has been conducted, risks assessed and mitigation measure put in place. Thus, the environment impact of this project is considered acceptable to the Bank.
Passation des marchés
The procurement procedures employed by the promoter will be reviewed by the Bank.
Statut
Signé - 16/12/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).