Référence: 20090403
Date de publication: 11 janvier 2010

Promoteur – Intermédiaire Financier

Reggefiber Group BV

Lieu

Description

The project concerns the roll-out of a new passive optical fibre telecommunication access network in 33 cities in the Netherlands. The network will connect central nodes with individual households by optical fibres and will be available on an equal (“Open”) basis to all telecom operators interested in the provision of ultra high speed broadband services.

Objectifs

This project will assist in providing high speed broadband services, in competition with other existing platforms. The project supports the renewed Lisbon Strategy to roll out high-speed internet in order to stimulate innovation and keep Europe at the forefront of internet usage, and to reach the goal of a 30% high speed broadband penetration of the EU population.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 130 million

Coût total (montant approximatif)

EUR 290 million total eligible project cost (total project cost for 33 cities 540 million)

Aspects environnementaux

Investments in fixed telecommunications projects (mainly civil works for urban fibre roll-out and long distance transmission systems) do not fall under Annex I of Directive 85/337 EC as amended by Directives 97/11/EC and 2003/35 EC. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures. Therefore it is not expected that the works will be subject to Annex II of the Directive. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).

Passation des marchés

According to Utility Directive 2004/17/EC the Telecom sector is exempt from public procurement procedures due to its competitive nature. Hence the purchasing of the private promoter is not regulated. The effectiveness of the applied procedures will be assessed during appraisal.

Statut

Signé - 29/10/2010

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Télécom