Date de publication: 9 septembre 2010
Promoteur – Intermédiaire Financier
TenneT Holding BV
Lieu
Description
The project is part of the electricity transmission development in the Western area of the Netherlands, referred to as “Randstad 380 kV”. The project encompasses 63 km of 380 kV overhead lines, partly combined with 150 kV circuits, 20 km of 380 kV underground cables and three new/extended substations having transformation capacity of circa 3,500 MVA.
Objectifs
Improvement of electricity network
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 450 million.
Coût total (montant approximatif)
EUR 919 million.
Aspects environnementaux
The overhead line components of the project pertain to Annex I of the EIA Directive and are currently undergoing Environmental Impact Assessment.
Typical impacts for the project’s components are vegetation clearance, removal of soil, visual impact, electromagnetic fields, impact on flying vertebrates, and temporary disturbance during construction. According to the Environmental Impact Study, appropriate environmental measures will be carried out during construction and operation so to minimize or compensate the identified impacts. The mitigating mesures include the burial of part of the connection and the adoption of a new type of pylon, called Wintrack, that significantly reduce the magnetic field zone as compared to standard pylon types.
Passation des marchés
The promoter implements public procurement procedures in line with the requirements of the EU Directive 2004/17/EC.
Statut
Signé - 27/01/2011
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).