Date de publication: 22 juin 2010
Promoteur – Intermédiaire Financier
Public Power Corporation S.A.
Lieu
Description
The Project consists of a combined cycle gas turbine (CCGT) power station with a maximum continuous rating of 832 MWe, to be constructed adjacent to unit no. 4 at the existing power station in central Peloponnesus, Greece.
Objectifs
The project will install modern gas-fired power generation technology with high electrical generation efficiency and a relatively low environmental impact. The new generating capacity provided will contribute to stabilising the transmission network in the South Western region of Greece, meeting future growth in electricity demand and to replacing existing lignite, heavy fuel oil and gas power stations that are scheduled to be decommissioned.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Under appraisal.
Coût total (montant approximatif)
Under appraisal.
Aspects environnementaux
Due to its capacity (plant over 300 MWth), the project is subject to Annex 1 of the EIA Directive (85/337/EC and amendments) and is required to undergo a full Environmental Impact Assessment. The promoter has confirmed that an Environmental Impact Assessment has been carried out in December 2008 and that the ministries and competent authorities have formulated a positive opinion on the project. The publication of the decision is expected in the near future.
Passation des marchés
As a state owned entity, the promoter is a public undertaking in the sense of the Art. 2.1(b) of the Utilities Directive 2004/17/EC. The turnkey EPC tender was announced in the OJEU in April 2008 – publication reference is 2008/S 76-103222 / 18-4-2008.
Statut
Signé - 14/07/2011
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).