Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100479
Date de publication: 26 novembre 2010

Promoteur – Intermédiaire Financier

Ministry of Agriculture, Forestry and Water Management of Republika Srpska

Lieu

Description

The project involves inventory of flood damages to flood protection infrastructure within the RS's main Danube tributaries, preparation of a Flood Risk Management and Flood Prevention plan including the identification of short, mid and long term measures and finally implementation of priority works for the remedy, repair and rehabilitation of damaged infrastructure in the most vulnerable areas. Aspects of spatial planning, redevelopment of flood areas and long and mid term flood prevention measures are also included.

Objectifs

The project purpose is to safeguard the agriculture, industrial and housing areas prone to flood impacts and to enable a stable future development. The continuous use of agriculture land will be effected and the spatial planning, finally being based on a stable situation of flood protection and prevention, will be able to focus on establishing protection zones and protected areas in accordance with the EC Directives. The project is expected to contribute to a stable and reliable flood protection in RS, protecting the environment and the people, in compliance with the requirements of the EC Flood Directive.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 74 million

Coût total (montant approximatif)

At least EUR 98 million

Aspects environnementaux

The project is environmentally driven. Enhanced protection and prevention levels will reduce contamination of the environment by septic tanks, sewerage, oil spills etc.

Passation des marchés

The promoter will have to ensure satisfactory application of the Bank’s Guide to Procurement and relevant EU rules, which will require international tendering, including publication in the OJEC, for large contracts.

Statut

Signé - 27/10/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Bosnie-et-Herzégovine Eau, assainissement