Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100483
Date de publication: 31 mars 2011

Promoteur – Intermédiaire Financier

Public sector Holding Company for Water and Wastewater (HCWW) under the aegis of the Ministry for Housing, Utilities and Urban Development

Lieu

Description

The project includes (i) capital investments to rehabilitate, upgrade or install new infrastructure (water treatment plants, waste water treatment plants and water and sewer networks) as well as (ii) accompanying measures to strengthen the institutional capacity in the sector. The individual investments in infrastructure will be prioritised on the basis of the Egyptian National Water Resources Plan and more detailed regional Master Plans.

Objectifs

The project will contribute to reducing pollution from discharge of untreated wastewater in the environment and to improving the quality of water services, thereby enhancing the living conditions of 15 million inhabitants in the Upper-Egypt Region.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 57 million

Coût total (montant approximatif)

EUR 303 million

Aspects environnementaux

The project is expected to have significant positive impacts on the environment and on social issues. It will improve access to safe drinking water and sanitation in the Upper Egypt Region. Though not directly applicable, all components under this project will comply with European environmental legislation, i.e. EIA directive 97/11/EC and Habitats Directive 92/43/EC).

Passation des marchés

In accordance with the NIF Framework Agreement, all programme components will be procured according to rules of the Lead Financing Institution (KfW). The EIB has requested KfW to publish all relevant tenders in the Official Journal of the EU in line with the ongoing discussions in the context of the Mutual Reliance Initiative.

Statut

Signé - 17/12/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Eau, assainissement