Date de publication: 31 mars 2011
Promoteur – Intermédiaire Financier
Acquedotto Pugliese S.p.A.
Lieu
Description
The project concerns the investment programme under the Master Plan, for the 2010-2012 period. The investments will mainly concern small to medium sized water and wastewater facilities and will be aimed at (i) reducing water losses, (ii) increasing the availability of water resources and (iii) expanding the water and wastewater networks and plants.
Objectifs
The project will contribute to meeting the requirements of the Urban Waste Water Treatment Directive and the Water Framework Directive. The resulting improved service standards and higher resilience to the effects of climate change qualify the operation as relevant for climate action.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 150 million
Coût total (montant approximatif)
Up to EUR 370 million
Aspects environnementaux
Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 97/11/EC, as amended by Directive 2003/35/EC, will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. In addition, for any part of the scheme that may impact on a nature conservation site, the promoter will be required to provide to the Bank information on the mitigating measures needed to comply with the Habitats Directive.
Passation des marchés
The Bank will require from the promoter that contracts for the implementation of the project have been or shall be tendered in accordance with relevant EU procurement laws (2004/17/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 30/11/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).