Référence: 20100722
Date de publication: 15 octobre 2013

Promoteur – Intermédiaire Financier

Bulgaria

Lieu

Description

The project consists of the construction of three new sections of the 2x2 Struma motorway south of Sofia from Dolna Dikanya to Blagoevgrad (Lots 1 and 2, 53.78 km) and from Damyanitsa to the Greek border at Kulata (Lot 4, 14.70 km). The total combined length is 68.48 km.The section between Blagoevgrad and Damyanitsa (67 km) is not part of this project and in the meantime, the existing I-1 road will ensure continuity. The project is located on the TEN-T network and co-financed with the EU Cohesion Fund.

Objectifs

The new motorway sections will reduce congestion and traffic through the towns along the corridor and will improve urban mobility and safety. The project will increase traffic speeds and thus contribute to travel time and operating cost savings.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 73 million

Coût total (montant approximatif)

EUR 385 million

Aspects environnementaux

The project relates to the construction of a new motorway and falls under Annex I 7b of the EIA Directive 2011/92/EU for which the EIA is mandatory . The Competent Authority approved the EIA (Decision Number 1-1(1)/2008) which describes corrective measures to mtigate the residual environmental impacts. The Appropriate Assessment states that the project in its section between Dupnitsa and Blagoevgrad has significant immitigable impacts for the Natura 2000 site Kocherinovo (BG0002099). Nevertheless, the Competent Authority considered that these are acceptable provided that the mitigation measures stated in the EIA Decision are implemented. To be checked at appraisal.

Passation des marchés

The project has been procured by the Road Infrastructure Agency (RIA) and contracts have been awarded through international open tenders in accordance with the Directive 2004/18/EC.

Statut

Approuvé - 12/11/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Bulgarie Transports