Référence: 20110005
Date de publication: 7 novembre 2011

Promoteur – Intermédiaire Financier

Electricity Authority of Cyprus (EAC)

Lieu

Description

The project concerns the phase IV of the extension of the Vasilikos Power Station in Cyprus, includingthe installation of a 220 MWe CCGT (Combined Cycle Gas Turbine) power plant to run on distillate fuel oil with planned conversion to natural gas operation when gas becomes available on Cyprus.

Objectifs

Construction of a combined-cycle gas turbine electricity generator in Cyprus.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 130 million

Coût total (montant approximatif)

EUR 260 million

Aspects environnementaux

Due to its capacity (plant over 300 MWth), the project is subject to the Annex I of the EIA Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment. The EIA study found the project’s impact on environment acceptable and the environmental permit was granted by the competent authorities in 2006.

Passation des marchés

The project is subject to the EU legislation on procurement (Directive 2004/17/EC) and the tender and its results were announced in the Official Journal of the EU.

Statut

Signé - 8/03/2012

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).