Date de publication: 9 mai 2012
Promoteur – Intermédiaire Financier
Ministry of Transport of the Czech Republic; Managing Authority of the Operational Programme of Transport in the Czech RepublicLieu
Description
The project consists of the renewal and electrification of the 13.46 km long single-track line between Zabreh and Sumperk. The project aims to integrate the railway line more closely into the regional network around Olomouc. The line speed is increased from 70 - 80 km/h to a maximum of 100 km/h. The loading capacity of the tracks is increased from UIC category D3 to category D4, which is common throughout much of Europe and allows for 22.5t/axle.
Objectifs
The main objective of the project is to modernise and electrify a feeder line to a TEN-T railway line between Prague and Prerov via Ceska Trebova and to improve the regional rail traffic operations North-East of Olomouc.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
CZK 183 million (EUR 8 million)
Coût total (montant approximatif)
CZK 1545 million (EUR 63 million)
Aspects environnementaux
Compliance with the EU directives relating to environmental protection was adequately addressed. The entire process of planning procedures, public enquiries and building permits has been respected. Based on a statement issued by the competent Authority, the project is not likely to have significant effects on Natura 2000 sites. Nevertheless, significant investment (6.3% of budget, approximately EUR 3.9 million) has been made for minimising or compensating negative environmental impacts.
Passation des marchés
EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The main contract was published in the OJEU under the reference number 2008/S 44-060738 on 4.3.2008. The procurement process is accountable under the Cohesion Funds regulations and is acceptable to the Bank.
Statut
Approuvé - 24/05/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).