Date de publication: 27 mai 2013
Promoteur – Intermédiaire Financier
HELLENIC GAS TRANSMISSION SYSTEM OPERATORLieu
Description
Upgrade of a liquefied natural gas (LNG) terminal to increase gas reception, storage and output capacity. The project involves the construction of a third tank, upgrade of the marine facility, the installation of cryogenic equipment and an upgrade of metering.
Objectifs
The project aims at debottlenecking storage and handling capacity at the existing LNG terminal.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 80 million
Coût total (montant approximatif)
EUR 166 million
Aspects environnementaux
The project adds installations to an existing LNG terminal on the island of Revithoussa, which is fully dedicated to the terminal’s operation. Given its technical characteristics the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. The competent authority has obtained an EIA for the construction of the third tank from the Ministry of Environment, Energy and Climate Change (MEECC), and the two other EIAs are being elaborated.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation, with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 11/06/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).