Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20110416
Date de publication: 1 octobre 2013

Promoteur – Intermédiaire Financier

HOLDING COMPANY FOR WATER AND WASTEWATER

Lieu

Description

The project involves the construction of two new Waste Water Treatment Plants (WWTPs), the expansion of three existing WWTPs and the laying of 694 km of sewers with the installation of 52 pump stations in the the Kafr El Sheikh Governorate.

Objectifs

The project will improve health standards for residents, the quality of irrigation water, as well as the environmental quality of the Nile, Lake Burullus, and the Mediterranean Sea. Indirect benefits include an expected increase in the volume and quality of fish in Lake Burullus (70% of the country's fishing industry), safer agriculture production, improved conditions for tourism on the Mediterranean coast, and job creation.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 104 million

Coût total (montant approximatif)

EUR 164 million

Aspects environnementaux

The objective of the project is to provide first time sanitation to residents in three rural districts (Motobas, Desoq, Burullus) of the Kafr El-Sheikh Governorate that have yet not been provided with such services, thus improving health standards for its residents, the quality of irrigation water, the environmental quality of River Nile, Lake Burullus and, ultimately the Mediterranean Sea, as well as further sustaining fish farming in Lake Burullus. These positive impacts will also support employment creation, both directly during construction and operation of the project, as well as indirectly, notably in fish farming and agriculture, as well as tourism on the Mediterranean coast.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement

Statut

Signé - 5/06/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Eau, assainissement