Date de publication: 13 décembre 2013
Promoteur – Intermédiaire Financier
Ministry of Transport of the Czech RepublicLieu
Description
Optimisation of railway line Mosty u Jablunkova - Bystrice nad Olsi - Cesky Tesin.
Objectifs
The project is part of the optimisation of the Slovak Republic State Border - Detmarovice railway line, in the Moravian-Silesian Region. The design parameters for the project comply with national standards for the modernisation of railway infrastructure. The project aims at providing the preconditions for considerably improved passenger services and full interoperability and sufficient capacity for freight traffic.
Commentaires
-
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
CZK 1697 million (EUR 62 million)
Coût total (montant approximatif)
CZK 10318 million (EUR 375 million)
Aspects environnementaux
The project complies with the EU directives relating to environmental protection. Based on a statement issued by the competent Authority, the project is not likely to have significant effects on Natura 2000 sites.
Passation des marchés
EU procurement directives have been transposed into Czech legislation by Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The procurement process is accountable under the Cohesion Funds regulations.
Statut
Approuvé - 7/02/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).