Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20120215
Date de publication: 20 septembre 2013

Promoteur – Intermédiaire Financier

The Slovak Republic through the Ministry of Transport. ŽSR (Železnice Slovenskej Republiky), the Slovak Railway company, is the implementing body for the project.

Lieu

Description

This operation will finance the modernisation of a 20 km long railway section between Trencianska Tepla and Belusa.

Objectifs

This project is part of the modernisation of the railway corridor between Bratislava and Žilina and will reduce travel time, operating costs, accidents and environmental impacts as well as improve the competitive position of rail in the Slovak transport market.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 40 million

Coût total (montant approximatif)

EUR 377 million

Aspects environnementaux

The project, modernisation of an existing railway, falls under Annex II of the EIA Directive Directive 2011/92/EU, being subject to an EIA depending upon the decision of a screening procedure, determined by the competent authorities. The Ministry of Environment of the Slovak Republic, as the Competent Authority (CA) determined that the project would be subject to EIA under national regulations prevailing in 2002 (the national EIA Act 127/1994 further amended and completed by Act 391/2000) and an EIA was carried out and approved in 2003 for the complete Nové Mesto nad Váhom – Púchov section. The project is not expected to impact upon Natura 2000 areas, as has been confirmed by the Competent Authority.

Passation des marchés

EU procurement directives have been transposed into Slovak legislation. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The procurement process is accountable under the Cohesion Funds regulations and is acceptable to the Bank.

Statut

Approuvé - 25/10/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Slovaquie Transports