Référence: 20120642
Date de publication: 12 février 2014

Promoteur – Intermédiaire Financier

MINISTRY OF TRANSPORT

Lieu

Description

The project concerns the construction of two sections of 2 x 2 expressway adjacent to the Warsaw ringroad in central Poland (37km in all)

Objectifs

The project concerns the construction of two sections of 2 x 2 expressway adjacent to the Warsaw ring road in central Poland: (i) about 22km between Radziejowice and Paskow to the south west of Warsaw (in two sub-sections) and (ii) about 15km around Marki to the north east of Warsaw (in two sub-sections). These form part of the broader S8 expressway route in Poland from Wroclaw in the south-west of the country to the border with Lithuania at Budzisk in the north-east and will facilitate the passage of long distance traffic around the city of Warsaw. The project complements the existing EIB operation Warsaw Ring Road 2.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 170 million

Coût total (montant approximatif)

EUR 537 million

Aspects environnementaux

The project involves the construction of new expressways in a rural and suburban environment. The various sections all fall under Annex I of EIA Directive 2011/92/EU requiring a full EIA procedure. The project sections are all located in the Masovian Region and have been subject to three, separate procedures. The project is situated in the vicinity of the following Natura 2000 areas: Dabrowa Radziejowska (PLH140003), Poligon Rembertow (PLH140034) and Biale Blota (PLH140038). Therefore, the provisions of the Habitats Directive (92/43/EEC) apply. The investments are included in the National Road Construction Program and the current Operational Program Infrastructure and Environment, both of which were subject to a form of strategic environmental assessment. The project likely involves the expropriation of private and public land as well as the involuntary resettlement of residential homes. The procedures and outcomes of the environmental and social assessment are to be further reviewed during appraisal.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]),), with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 15/10/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Transports