Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20120645
Date de publication: 19 février 2013

Promoteur – Intermédiaire Financier

TRANSPORT FOR LONDON

Lieu

Description

Addition of up to 65 cars to the existing rolling stock fleet to provide for 5-car unit train services on the London Overground lines as well as infrastructure improvements on the network for capacity enhancements.

Objectifs

The project will increase the efficiency and quality of public transport services in Greater London. By facilitating the improvement of the level of service, principally by reducing the level of peak hour crowding, the project is expected to contribute to encouraging modal shift away from road transport promoting time, vehicle operating cost and safety benefits.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

GBP 130 million (EUR 154 million)

Coût total (montant approximatif)

GBP 282 million (EUR 334 million)

Aspects environnementaux

Manufacturing of rail rolling stock doesn’t fall under the EIA directive 2011/92/EU. Some of the schemes will be related to improved public transport infrastructures and therefore might fall under Annex II, according to which authorities decide on a case-by-case basis whether EIA has to be carried out or not. Full details on EIA and Natura 2000 issues will be checked at appraisal stage. The project contributes to reducing reliance on private cars and negative impact of transport on the environment, thus contributing to climate change objectives.

Passation des marchés

The promoter is a public entity subject to EU public procurement regulations. The Bank will require the promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and 2004/18/EC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate. All the details will be checked at appraisal stage.

Statut

Signé - 7/05/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Transports