Date de publication: 10 juillet 2013
Promoteur – Intermédiaire Financier
JAZZTEL PLCLieu
Description
The project concerns the roll-out of a telecommunication access infrastructure based on optical fibres to individual households (Fibre-To-The-Home / FTTH).
Objectifs
The project includes the roll-out of the fibre network, including the related investments in the backbone network and IT systems.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 150 million
Coût total (montant approximatif)
EUR 590 million
Aspects environnementaux
Investments in fixed telecommunications projects (mainly civil works for urban underground copper/fibre roll-out) do not fall under Annex I and II of Directive 2011/92/EC. The related works have typically limited residual environmental effects as they are carried out in urban areas as well as alongside roads.
Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).
Passation des marchés
The promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement.
Statut
Signé - 3/04/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).