Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140024
Date de publication: 14 mai 2014

Promoteur – Intermédiaire Financier

Manchester City Council

Lieu

Description

Framework loan to finance urban regeneration investment in Manchester, including development of urban infrastructure, puiblic buildings and service facilities, low carbon investments in heating and energy efficiency, and co-financing of financial instruments using European Structural and Investment Funds (ESIF).

Objectifs

The project aims at facilitating the combination of decentralised financial instruments (i.e. ESIF funded financial instruments available to Member States and regions) with EIB funding in order to increase the leverage effect and enhance the Bank's product offering. In addition, this project brings together technical assistance resources, available for project preparation and implementation, funded from either ESIF or ELENA resources.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

GBP 100 million (EUR 126 million)

Coût total (montant approximatif)

GBP 230 million (EUR 289 million)

Aspects environnementaux

The project comprises a multi-scheme operation classified as a Framework Loan and some of the schemes may eventually fall under Annex II of the EIA 2011/92/EU Directive. Should any such scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned Directives as transposed into the national law. It is a requirement that all schemes must be implemented in compliance with the EU environmental legislation.

Passation des marchés

The promoter will be required to follow the EU public procurement rules (2004/18/EC), including the publication of contract notices in the EU Official Journal as implemented by national law, if and where appropriate. Projects with values below the EU thresholds will be procured according to the provisions laid down in national legislation.

Statut

Signé - 27/11/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Aménagement urbain