Date de publication: 16 octobre 2017
Promoteur – Intermédiaire Financier
MINISTERE DE L'EQUIPEMENT, DE L'HABITAT ET DE L'AMENAGEMENT DU TERRITOIRELieu
Description
Construction of a 98.9 km long 2 x 2 motorway on a new alignment in the central part of Tunisia between the cities of Sbikha (some 30 km north of Kairouan) and Jelma.
Objectifs
The project benefits expected include time savings and vehicle operating cost reductions for road users on the corridor, due to enhanced road capacity. The project may also offer safety benefits.
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Montant BEI envisagé (montant approximatif)
EUR 166 million
Coût total (montant approximatif)
EUR 332 million
Aspects environnementaux
If located within the EU, the project would fall under Annex I of the EIA Directive 2011/92/EC. One main Environmental Impact Assessment (EIA) procedure, including public consultation, has been carried out in accordance with national legislation in Tunisia. The Bank shall investigate environmental and social aspects and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Statut
Signé - 14/12/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).