Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140148
Date de publication: 1 avril 2014

Promoteur – Intermédiaire Financier

London Borough of Barking and Dagenham

Lieu

Description

Development of social and affordable housing to be operated by the London Borough of Barking & Dagenham.

Objectifs

Under the Framework Loan operation "London Green Fund Co-financing Loan", it is proposed to allocate funding to a large sub-project above the EUR 50m equivalent threshold: The Gascoigne housing estate redevelopment and regeneration is located in the London Borough of Barking and Dagenham, situated in East London. The scheme will concern the demolition and redevelopment of the housing estate area dating from the 1960s, located within the Borough's central area, Barking town centre.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

GBP 40 million (EUR 49 million)

Coût total (montant approximatif)

GBP 80 million (EUR 98 million)

Aspects environnementaux

Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the urban renewal, rehabilitation and reconstruction investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during project appraisal.

Passation des marchés

The Bank will require the borrower to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

Statut

Approuvé - 4/06/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Aménagement urbain