Date de publication: 13 juillet 2015
Promoteur – Intermédiaire Financier
Parkwind, Sumitomo Corp, Zeewind I BVLieu
Description
Construction of the second phase (165 MW) of an offshore windfarm (phases1 2: 336MW) located 46km from the Belgian coast
Objectifs
The development of offshore wind energy will support EU and national targets for renewable energy generation and contribute to security of energy supply and environmental objectives. The project is therefore eligible under Article 309 point (c) common interest (energy/renewable energy). The project will further contribute to the Bank's priority objectives for energy sector lending related to renewable energy and climate action (transversal).
Commentaires
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 250 million
Coût total (montant approximatif)
EUR 653 million
Aspects environnementaux
By virtue of its technical characteristics the entire offshore wind farm (phases 1&2, 336 MW) would fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU). According to national law the project is subject to a mandatory EIA, which was undertaken. Following rounds of public consultation and expert advice, the competent authority has approved the EIA and granted a general, conditional construction and operating permit. With adequate precautionary measures, the impacts on fauna and flora, including on local and migrating birds, marine mammals, benthos and invertebrates were considered acceptable.
Passation des marchés
A concession for the development of the entire wind farm was granted by the government, awarded on the basis of objective, proportionate and non-discriminatory criteria according to national legislation. Thus, the project does not enjoy special or exclusive rights and therefore does not have to follow the provisions of the Utilities Directive. The project will be delivered on a multi-contract basis, which is a common approach for offshore wind farms.
Statut
Signé - 21/10/2015
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).