Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140329
    Date de publication: 23 février 2015

    Promoteur – Intermédiaire Financier

    LUCKNOW METRO RAIL CORPORATION LTD

    Lieu

    Description

    Construction of a 23km metro line and purchase of a fleet of about 80 metro cars in Lucknow, Uttar Pradesh, in northern India.

    Objectifs

    The proposed operation will be extended under the Own Risk Facilities (ORF), Climate Action and Environmental Facility (CAEF) for the 2014-2016 period. The project will contribute to the two main objectives of the EIB's external mandate: (i) climate change mitigation, by promoting modal shift from road to rail and thereby a reduction of greenhouse gas (GHG) emissions; and (ii) the development of social and economic infrastructure by making a key contribution to urban development, thereby improving the business environment for private sector development and facilitating access to amenities and jobs. The project is consistent with the EU country strategy paper for India which highlights the infrastructure gap and need to address rising GHG emissions. The project is consistent with the National Urban Transport Policy 2006 and Lucknow City Masterplan.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 450 million

    Coût total (montant approximatif)

    EUR 914 million

    Aspects environnementaux

    If situated in the EU, the project would fall under Annex II of the Environmental Impact Assessment (EIA) Directive and would therefore be subject to screening by the competent authority to determine whether a full EIA procedure should be undertaken. The federal competent authority has screened the project out in accordance with domestic legislation. The project has been subject to an initial environmental assessment and further steps in assessing and managing environmental risks are to be reviewed during appraisal. The project will require the acquisition of about 50ha of land and will entail permanent involuntary resettlement of some households/businesses plus generate some temporary road traffic disruption. Compliance with relevant EIB social standards will be reviewed.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 30/03/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Inde Transports