Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140664
Date de publication: 11 mai 2015

Promoteur – Intermédiaire Financier

Nemzeti Infrastruktúra Fejleszto Zrt (NIF – National Infrastructure Development Company)

Lieu

Description

The project is a major project allocation under a Regional Accessibility Co-Financing Framework Loan and consists of the rehabilitation and new construction of approximately 39 km of Road 62 (2x1 lanes) between Székesfehérvár and Dunaújváros (M8 new Danube bridge) in Hungary.

Objectifs

Road 62 plays an important role in the connectivity between the eastern and western parts of Hungary, connecting the M8 motorway bridge south of Dunaújváros. The road rehabilitation, including pavement strengthening and bypass construction, will reduce journey times and vehicle operating costs, and improve accessibility and traffic safety.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 19 million

Coût total (montant approximatif)

EUR 71 million

Aspects environnementaux

The project was included in recent strategies and programmes subject to the Strategic Environmental Assessment (SEA) Directive 2001/42/EC. The project is a class of development that falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. The construction of the Seregélyes bypass was subject to preliminary environmental assessment (EIA screening). The Environmental, Nature Conservation and Water Management Inspectorate (the Inspectorate) concluded that the project would not have a significant environmental impact. The cumulative impact was considered under an environmental performance evaluation; this was accepted by the Inspectorate in 2011.

Passation des marchés

The promoter is a public entity obliged to comply with European and national public procurement legislation. Works and service contracts were procured for the four project sections and lots. Five design service, four construction works and three supervision service contracts were published in the Official Journal of the European Union, in accordance with Directive 2004/18/EC, using open procedure, and were awarded on lowest price.

Statut

Approuvé - 12/06/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports