Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150053
Date de publication: 12 mars 2015

Promoteur – Intermédiaire Financier

OMNICANE

Lieu

Description

Installation and operation of a carbon burn-out facility for coal ashes to convert coal fly and bottom ashes into additives for portland cement. This is an innovative waste-management project to address the problem of ash disposal in Mauritius.

Objectifs

The key objective of this operation is to transform waste into a valuable input to another process, which would offer substantial environmental benefits avoiding the disposal/landfilling of ashes which cannot be sustained in the long term due to the decreasing availability of space.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 8 million

Coût total (montant approximatif)

EUR 22 million

Aspects environnementaux

The local environmental competent authority required the promoter to execute an environmental impact assessment (EIA). The position in respect of national legislation will be confirmed at appraisal.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.

Statut

Signé - 27/11/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Maurice Déchets solides