Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150204
Date de publication: 15 juillet 2015

Promoteur – Intermédiaire Financier

HUNGARY

Lieu

Description

The project is a major project allocation under the Regional Accessibility Co-Financing framework loan and consists of the rehabilitation of 54 km of single carriageway (2x1 lane) and 7 km of dual carriageway (2x2 lanes) sections of Road 47 between Szeged and Békéscsaba in Hungary.

Objectifs

Road 47 is a second class road that connects Szeged and Békéscsaba in the south-east of Hungary. The road has an important local and regional role and also caters for strategic traffic. The rehabilitation of Road 47 is expected to provide economic benefits through travel time savings, improved journey time reliability and reduced vehicle operating costs.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 27 million

Coût total (montant approximatif)

EUR 106 million

Aspects environnementaux

The project was included in the Transport Operational Programme 2007-2013, the National Transport Strategy and the National Spatial Plan. All were subject to strategic environmental assessment according to Directive 2001/42/EC. The project is a class of development that falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. The project was screened out of further assessment and a full EIA procedure was not required. A screening on nature conservation areas was also undertaken. The project has received environment decisions by the national competent authorities.

Passation des marchés

The promoter is a public entity obliged to comply with European and national public procurement legislation. Works, design service and supervision contracts were procured for the three project sections. The contracts were published including in the Official Journal of the European Union (OJEU), in accordance with Directive 2004/18/EC, using open or negotiated procedure, and were awarded on lowest price.

Statut

Approuvé - 22/09/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports