Date de publication: 28 octobre 2015
Promoteur – Intermédiaire Financier
PUBLIC ENTITY(IES)Lieu
Description
Financing of new commercial port and dredging works in the port of Gaeta
Objectifs
The project is the final part of the port masterplan to increase quay and alongside draft length to enable larger ships to use the facility, to develop more yard area within the port and to improve road access.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 27 million
Coût total (montant approximatif)
EUR 36 million
Aspects environnementaux
An environmental impact assessment (EIA) for the project was undertaken and approved by the Ministry of Environment in July 2005 (National Regulations DPCM 27/12/1988 and DPCM 10/08/1988 No. 377 and following amendments; Law 8/7/1986). The project falls under Annex I of the EIA Directive (2011/92/EU).
Passation des marchés
The promoter is a contracting authority, as referred to in Article 8 of Directive 2004/17/EC governing the procurement and procedures for entities operating in the public sector. Therefore, all contracts financed by means of this project have been or will be tendered in accordance with this directive, with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 18/12/2015
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).