Date de publication: 27 janvier 2016
Promoteur – Intermédiaire Financier
HKL - HELSINKI CITY TRANSPORTLieu
Description
This is a multi-scheme project included in the investment plan of Helsinki City Transport (HKL). It consists of procurement of tram cars, tram tracks and other tram network-related investments.
Objectifs
The project will include the reconstruction of existing tram tracks, the tramway rolling stock renewal, and small tramway extensions such as the link to the new terminal in Jätkäsaari and extensions on the western side of the city centre. The investments will improve reliability and performance of the tramway network in the City of Helsinki.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 180 million
Coût total (montant approximatif)
EUR 360 million
Aspects environnementaux
Finland, as a Member State, is obliged to follow the relevant EU rules in relation to the environmental impact of projects (namely the Strategic Environmental Assessment (SEA), Environmental Impact Assessment (EIA) and Habitat/Natura 2000 Directives). The Bank's appraisal will primarily focus on the promoter's environmental management capacity and on the verification of the correct application of these directives. Requirements under SEA Directive 2001/42/EC will also be examined at this stage.
Potential schemes might fall under Annex I or II of the EIA Directive (2011/92/EU). Details on environmental aspects of each of the schemes and compliance with the EIA Directive as well as other applicable directives, including Birds and Habitats, will be checked at allocation stage.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The tender for the tram cars was awarded in 2011 following publication in the Official Journal (No 2011/S 146-242270).
Statut
Signé - 9/06/2016
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).