Date de publication: 19 avril 2018
Promoteur – Intermédiaire Financier
IBERDROLA SALieu
Description
The project concerns the construction of three new large dams and three hydropower plants with a total capacity of 1,158 MW in the Tâmega River Basin in northern Portugal.
Objectifs
Initiated in 2007 as part of the Portuguese National Programme for Dams with High Hydroelectric Potential (PNBEPH), the project aims at supporting the increase of electricity generation from renewable sources in Portugal as well as contributing to security of electricity supply by providing system flexibility and system services in the joint Portuguese-Spanish electricity market.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 650 million
Coût total (montant approximatif)
EUR 1485 million
Aspects environnementaux
The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) and therefore has undergone an Environmental and Social Impact Assessment (ESIA) according to the national standards which also included a public consultation. The project's environmental permit has been issued on 21 June 2010. The project is expected to create up to 3 500 direct employments and 10 000 indirect employments. As required in the environmental permit, the sponsor put in place a Social & Economic Action Plan in 2014, of which 40% represents compensation and enhancement actions.
Passation des marchés
The promoter is a private entity operating in the energy sector. It is listed as a contracting entity in the EU Directive 2004/17 on public procurement. Following a competitive tendering process organised in 2008, the sponsor Iberdrola has been awarded the 70 year concession for the design, building and operation of the project. The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2004/17/ 2014/24/EU / 2014/25/EU, where applicable, as well as Directive 92/13/EEC (amended 2007/66/EU) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.
Statut
Signé - 23/07/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).