Date de publication: 2 août 2016
Promoteur – Intermédiaire Financier
JAVNO PREDUZECE AUTOCESTE FBIH DOOLieu
Description
Construction of a new 2.8 km-long motorway section including a 2.4 km-long twin tunnel and ancillary structures between Ponirak and Vraca (exit of the tunnel Zenica) in the central part of Bosnia and Herzegovina (BiH)
Objectifs
The project is part of Corridor Vc connecting the Croatian coast to Budapest through BiH and forms part of the southeastern axis of the extension of the TEN-T network to neighbouring countries. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project lies on a section pre-identified as a priority under the EU-sponsored 2015 Connectivity Agenda and a Western Balkans Investment Framework (WBIF) investment grant has been requested to support this project. The consistency of the project with the EIB transport lending policy is to be confirmed during appraisal.
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 69 million
Coût total (montant approximatif)
EUR 101 million
Aspects environnementaux
If located in the EU, the project, consisting of the construction of a new greenfield motorway, would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore require a full EIA including public consultation. In the Federation of Bosnia and Herzegovina it falls under the EIA procedure as stipulated by the law on environmental protection and pertaining regulation of BiH. The promoter has already provided an EIA study for the project, carried out in accordance with the above-mentioned legal framework. Its content and compliance with the principles of the relevant EU directives on strategic environmental assessment (SEA), EIA and nature conservation will be reviewed during appraisal.
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules. The customary announcements will have to be published in the Official Journal of the EU, inviting firms and joint ventures to submit expressions of interest to participate in the supervision and works for the project.
Statut
Signé - 26/04/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).