Date de publication: 30 septembre 2016
Promoteur – Intermédiaire Financier
MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRELieu
Description
Construction of a 2x2 lane viaduct of about 2070 m and its connections to the urban network of the city of Bizerte
Objectifs
The project rationale is to reduce traffic congestion in the city centre of Bizerte, Tunisia's third-largest city.
Commentaires
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 123 million
Coût total (montant approximatif)
EUR 247 million
Aspects environnementaux
If the project was located within the EU, it would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and would require full EIA and public consultation. Two full EIA procedures with public consultations for the different components of the project have been done according to Tunisian national legislation. The Bank shall investigate environmental and social (E&S) aspects and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Statut
Signé - 3/01/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).